Documentation
Audit
Conformance
Safety
Time Control
   
To ensure that construction is in accordance with the requirements of the contract documents, good workmanship and specified materials, Kerry Contractors, Project Team and Field Supervisory Staff encompass six critical areas of Quality Assurance.
   
"Quality is our top priority, and we work hard to exceed our client's expectations."

Construction Management sGeneral ContractingsIndustrial & Commercial Design

Kerry conducts a review of soil investigation reports, test borings and the bearing capacity of the subsoils. The accuracy of contractor's planning is checked and layout of the sites, the buildings thereon, their elevations and all utilities.

Inspections and test results are then recorded on appropriate forms. All follow-up and corrective action is identified where materials and workmanship do not conform to the contract specifications.

Inspection
 
Quality Assurance Quality Assurance Quality Assurance Quality Assurance

Documentation

Field Supervisory
Staff inspect,
photograph and
document the
following
___

g Contractor's equipment and Scaffolding
g Backfill, soils graduation, compactions, etc.
g Utility installations.
g Concrete pre-placement including forming, surface preparation, cleanliness, embedments & reinforcing steel.
g Concrete placement controls including rate of placement, method of placement, vibration & construction joints.
g Concrete testing, slump, air temperature and water addition.
g
Concrete placement, finishing, curing and protection.
g Structural steel erection.
g System cleaning (HVAC, Plumbing, etc), flushing and hydrostatic testing.
g Installation of mechanical, electrical and instrumentation tubing.
g Installation of electrical power and control cable including cable tray and duct banks.
g Building materials. All required tests are witnessed and certified.
g Workmanship and finishes.

6
Continue with Quality Assurance
Home Page | Construction Mgmt. | Quality Assurance | Design Services | Overview | Corporate Profile
General Contracting | Project Bidding | Project Team | Subcontractors | Contact Us | Site Map
© 2001-2002 Kerry Contractors Inc. All Rights Reserved.
Disclaimer Notice
Site Developed & Maintained by Advanced Computer